Wood Technoloy
Hardware and software development
The wood projects "The Sequential Wall" and "The Opening" were build up through an industrial 6-axis robot at the Professorship for Architecture and Digital Fabrication, ETH Zurich. Specific export code and design functions that facilitate the integration of real world constraints into the design software environment got developed. On the hardware side a special wood gripper was engineered. Hardware and software are in close relation and supplement each other.
ETH Zurich, Professorship for Architecture and Digital Fabrication
Prof. Gramazio, Prof. Kohler, Silvan Oesterle, Ralph Baertschi, Mike Lyrenmann
Fabrication Facility at ETH Zurich
Gripper Detail